



143 من الصور
الموقع
Svappavaara, NRBT, SWE
Svappavaara, NRBT, SWE
الاستخدام
21,149 ساعات
21,149 ساعات
الرقم التسلسلي
DHKCECEALK0021039
DHKCECEALK0021039
Loading...
هذه المجموعة محمية بموجب IronClad Assurance
اشترِ بثقة عندما تعرف أنَّ هذه المجموعة قد فُحصت تفصيليًا وبالكامل بواسطة فاحِص مؤهل.
رقم الهوية
#14350754
ياردة
كلا
الميزات
Air Conditioner, Rear View Camera, Trimble GPS Grade Control, Requires AdBlue, 3180 mm Stick, Auxiliary Hydraulic Plumbing, Stick Check Valve, Boom Check Valves, 700 mm Triple Grouser Track Shoes, Hydraulic Quick Coupler, 2150 mm Hydraulic Tilting Bucket, Auto Lube
ملحوظات
<h2>Seller supplied service records are available; please see below for a summary of the primary replaced components.</h2> <ul> <li>Rebuilt engine (incl replaced crankshaft) at 9336 hrs </li>



























Serial Number / VIN
DHKCECEALK0021039, No serial plate gound
Hour Meter / Odometer
21149 hrs, Hours may increase as machine is still in use by seller-No guarantees made as to actual hours/miles/kilometers; the inspection report reflects what can be visually observed.
Paint
Sheet Metal (fiberglass) Condition
Steps/Ladders
Hand Rails
Weld on Handrail to engine
Exterior Lights
Operational, Some not operational, Lower cab lights not functioning , Right bottom light has lense damaged lights are not operational

Horn
Operational
Seat Belts
Operational
Safety Lock Out/Stop
Operational
Swing Brake
Operational
Current Safety Manual
Current Operator/Maintenance Manual





















Seats/Armrests
Weld on seat mount
Mirrors
Hydraulic Controls
Auxiliary Hydraulic Control
Drivetrain Controls
Dash Console
Engine Oil Pressure
The fault indicator shuts off after the engine oil pressure rises.
Warning Lights
Operational, Low coolant light stays on
Gauges
Operational
Air Conditioner
The ambient temperature is too cold to check
Heater
Operational
Limited Function Check
The main components are in place and operational as noted.










Engine
No US EPA Label Present Requires AdBlue
Emission Label
Engine Serial Number
A/C Compressor
In place; ambient temperature too cold to check operation
Blow-by (subjective visual observation)
Minor
Starter
Operational
Exhaust System
Radiator
Oil Leaks
No dripping leaks
Fuel Leaks
No dripping leaks
Cooling System Leaks
No dripping leaks
Engine - Left Side
Engine - Right Side
DEF / AdBlue Tank
Limited Function Check
The engine started and ran.


Left Drive Motor
Right Drive Motor
Left Final Drive
Right Final Drive
Limited Function Check
The drivetrain was operational.
















Pumps (Hydraulics)
Hydraulic oil on plate under pump, can not see source of leak
Valves
Hydraulic Tank
Hoses (Hydraulics)
Auxiliary Hydraulic Plumbing
Operational, End of stick
Swing Motor
Hydraulic Center Swivel
has oil residue
Boom Lift Cylinder(s)
Stick Cylinder
Bucket Cylinder
Limited Function Check
The hydraulic system was operational.

























Boom Condition
Stick Condition
Boom Base Pin and Bushings
Pin and Bushings Boom to Stick
Pins and Bushings Stick to Coupler
Turntable Bearing
Bottom Covers
Plate below hydraulic valves missing
Limited Function Check
The main components were operational in a limited check.






























Left Roller Frame
Left Track Tensioner
Left Track Shoes
Left Grouser Height
26 mm
Left Track Links
Left Carrier Rollers
Left Track Rollers
Left Idler
Left Sprocket
Right Roller Frame
Right Track Tensioner
Right Track Shoes
Right Grouser Height
26 mm
Right Track Links
Right Carrier Rollers
Right Track Rollers
Right Idler
Right Sprocket











Excavator Bucket Condition
Cutting Edge / Teeth / Adapters
Some wear
Quick Coupler
Operational
يجب دفع المبلغ الكامل للعناصر بحلول الاثنين، 7 يناير 2030. ستُطبق رسوم تأخير بعد تاريخ الاستحقاق.
انقل معداتك حيث يجب أن تكون مع حلول الشحن واللوجستيات المتكاملة من الباب إلى الباب من ريتشي وإخوانه. نهتم بكل خطوة في الرحلة من خلال خدمتنا الشاملة لعبور معداتك للحدود والقارات والمحيطات بسرعة وكفاءة
المعلومات التفصيلية حول المعدات محدودة النطاق، ولم تفحص شركة ريتشي وإخوانه للمزادات العلنية أي جوانب أو مكونات من المعدات بخلاف تلك المنصوص عليها صراحة في هذه الوثيقة. ما لم يُنص صراحة على ذلك، نحن لا نقدم أي تعهدات أو ضمانات، صريحة أو ضمنية، في ما يتعلق بالمعدات أو مكوناتها، بما في ذلك على سبيل المثال لا الحصر أي تعهدات أو ضمانات تتعلق بالتشغيل أو المطابقة أو الامتثال لأي معيار أمان أو متطلبات أي سلطة أو هيئة تنظيمية معنية، أو الملاءمة لأي غرض معين، أو قابلية التسويق. ننصحك بشدة بإجراء فحص تفصيلي خاص بك للمعدات قبل تقديم المزايدات.
لم تُختبر المعدات تحت حمل ولم تُشغَّل على جميع السرعات المتاحة. نحن لا نقدم أي تعهد أو ضمان بأن المعدات تعمل وفق مواصفات الشركات المصنعة. لم يُجرَ أي فحص في ما يتعلق بأي جانب تشغيلي بخلاف تلك الجوانب المدرجة صراحة في هذه الوثيقة. تم توفير صور مختارة لبعض مكونات الهيكل السفلي الفردية، وقد لا تعكس هذه الصور حالة الهيكل السفلي بأكمله.
القياسات مُقدمة بشكل تقريبي فقط. قد تختلف الأبعاد الفعلية للحمولة بناءً على ارتفاع الشاحنة/المقطورة وتكوين/وضع الآلة المُحمَّلة. تقع على عاتق المشتري مسؤولية قياس جميع الأحمال قبل مغادرة موقع المزاد الخاص بنا لضمان أن الحمولة آمنة للنقل. يجب أن يتحقق المشتري من جميع القياسات. لا تعتمد على هذه القياسات لأغراض النقل.