132 من الصور
2014 Mack GU713 8x4 شاحنة قلابة /ثلاثة محاور
الموقع
Lancaster, New Hampshire, الولايات المتحدة
Lancaster, New Hampshire, الولايات المتحدة
الاستخدام
299,422 mi
299,422 mi
الرقم التسلسلي
1M2AX09C2EM019514
1M2AX09C2EM019514
2014 Mack GU713 8x4 شاحنة قلابة /ثلاثة محاور
Lancaster, New Hampshire, الولايات المتحدة
معلومات تفصيلية حول المعدات
هذه المجموعة محمية بموجب IronClad Assurance
اشترِ بثقة عندما تعرف أنَّ هذه المجموعة قد فُحصت تفصيليًا وبالكامل بواسطة فاحِص مؤهل.
رقم الهوية
#16250246
ياردة
كلا
الميزات
Mack MP8 6 Cylinder 12.8 L 425 hp Engine, 2013 US EPA Label, Requires Diesel Exhaust Fluid, 14510 Engine hrs, Air Conditioner, Cruise Control, Engine Brake, Eaton Fuller Manual Transmission, 18000 lb Front Axle, 44000 lb Rears, Mack Drive Axles, 62000 lb GVWR, Air Ride Cab, Aluminum Wheels, 385/65R22.5 Front Tires, 11R24.5 Rear Tires, Air Lift Pusher Axle, Camelback Spring over Walking Beam Suspension, 228 in Wheelbase, PTO, OX Bodies 16 ft Long x 4 ft High Steel Body, Electric Roll Tarp
General Appearance
(31)






























Serial Number / VIN
1M2AX09C2EM019514
Frame Stamp Serial Number/VIN Photo
Hour Meter / Odometer
299422 mi-No guarantees made as to actual hours/miles/kilometers; the inspection report reflects what can be visually observed.
Motor Vehicle Safety Standards Label
Yes
Paint
Sheet Metal (fiberglass) Condition
Steps/Ladders
Hand Rails
Glass
Exterior Lights
Operational
Brakes / Tires
Steer Axle
- 20/32" Aluminum
- Drum
- Drum
- 21/32" Aluminum
Rear Axle
- 16/32" Aluminum
- Missing
- Covered
- Covered
- Missing
- 16/32" Aluminum
Rear Axle
- 15/32" Aluminum
- 14/32" Aluminum
- Drum
- Drum
- 25/32" Aluminum
- 24/32" Aluminum
Rear Axle
- 12/32" Aluminum
- 7/32" Aluminum
- Drum
- Drum
- 22/32" Aluminum
- 24/32" Aluminum
Engine
(22)





















Emissions Information
2013 US EPA Label, Requires Diesel Exhaust Fluid
Emission Label
A/C Compressor
In place; ambient temperature too cold to check operation
Blow-by (subjective visual observation)
No noticeable vapor or pressure
Starter
Operational
Air Compressor
Operational, Audible air leaks after shut-down, Leaks at center of truck
Fuel System
Operational
Exhaust System
Diesel Particulate Filter
Several wires appear disconnected at DPF
Radiator
Oil Leaks
No dripping leaks
Fuel Leaks
No dripping leaks
Cooling System Leaks
No dripping leaks
Engine - Left Side
Engine - Right Side
DEF / AdBlue Tank
Limited Function Check
The engine started and ran.
Cab
(24)























Engine Hours
14510 Engine hrs
Mirrors
Window Controls
Left Manual / Right Power
Seats/armrests
Seat Belts
Operational
Steering Control
Horn
Air horn operational, Electric horn operational
Oil Pressure
The gauge registers in the operating range.
Warning Lights
Operational, Check engine light stays on, ABS light stays on, Multiple screen messages “poor DEF quality will derate in 999 minutes” did not change after running for over an hour… light stays on
Gauges
Operational
Gear Selector
Brake Control
Operational
Engine Brake
Not operationally checked
Clutch
Engages, CLUTCH PEDAL WAS STUCK WHEN FIRST MOVING TRUCK….. PUMPED PEDAL MULTIPLE TIMES, CLUTCH FINALLY ENGAGED
PTO Control
Air engaged, Operational
ECM Miles
299422 ECM mi
Air Conditioner
The ambient temperature is too cold to check.
Heater
Operational
Limited Function Check
The main components are in place and operational as noted.
Underbody
(42)









































Steering Components
Steer Axle
Transmission
Operational
Power Take Off
Operational
PTO Pump
Non-Driven Drop Axle (1)
Front Drive Axle
Rear Drive Axle
Limited Function Check
The drivetrain was operational.
Cab Suspension Air Bags
Frame Condition
Suspension Springs/Hangers
Suspension Bushings
Suspension Air Bags
Left Steer Tire
Left Front Drive Tires
Left Rear Drive Tires
Right Rear Drive Tires
Right Front Drive Tires
Right Steer Tire
Wheel Condition
Wheel Studs
Hydraulic Tank
Hoses
Cylinder(s)
Cylinder Pins and Bushings
Limited Function Check
The hydraulic system was operational.
Park Brake
Limited Function Check - Brakes
The brake system functioned, stopping and holding the machine.
v2 Configuration - Dump Trucks
(13)












Bed Body
Tailgate
Tailgate Latch
Support Frame
Rusty, appropriate for age
Hinge Points
External Electrical / Air Connections
Not operationally checked
Tarp
Electric Tarp, Not operational
معلومات إضافية
بنود المزايدة والبيع
رسوم المعاملات
الدفع
يجب دفع المبلغ الكامل للعناصر بحلول الأربعاء، 8 يناير 2031. ستُطبق رسوم تأخير (يفتح في علامة تبويب جديدة) بعد تاريخ الاستحقاق.
الشحن والاستلام
- لا يمكن للمشترين نقل مشترياتهم من موقع المزاد حتى يدفعوا فاتورتهم كاملةً.
- يجب على السائقين إحضار نسخة من تذكرة الإفراج عن العنصر من شركة ريتشي وإخوانه لاستلامه.
- لقد عقدنا شراكة مع VeriTread لنُسهِّل عليك العثور على أفضل شركات النقل بأقل الأسعار. اطلب عروض أسعار مجانية أو احصل على تقديرات فورية لتكلفة الشحن من VeriTread مباشرةً.
أداة تقدير تكلفة الشحن
لقد عقدنا شراكة مع VeriTread لنوفر لك أفضل شركات النقل بأقل الأسعار. احصل الآن على عروض أسعار سريعة ومجانية وتنافسية لنقل معداتك إلى موقع المزاد أو منه - دون مكالمات هاتفية غير مرغوب فيها ودون أي التزامات
معلومات عامة
المعلومات التفصيلية حول المعدات محدودة النطاق، ولم تفحص شركة ريتشي وإخوانه للمزادات العلنية أي جوانب أو مكونات من المعدات بخلاف تلك المنصوص عليها صراحة في هذه الوثيقة. ما لم يُنص صراحة على ذلك، نحن لا نقدم أي تعهدات أو ضمانات، صريحة أو ضمنية، في ما يتعلق بالمعدات أو مكوناتها، بما في ذلك على سبيل المثال لا الحصر أي تعهدات أو ضمانات تتعلق بالتشغيل أو المطابقة أو الامتثال لأي معيار أمان أو متطلبات أي سلطة أو هيئة تنظيمية معنية، أو الملاءمة لأي غرض معين، أو قابلية التسويق. ننصحك بشدة بإجراء فحص تفصيلي خاص بك للمعدات قبل تقديم المزايدات.
التشغيل
لم تُختبر المعدات تحت حمل ولم تُشغَّل على جميع السرعات المتاحة. نحن لا نقدم أي تعهد أو ضمان بأن المعدات تعمل وفق مواصفات الشركات المصنعة. لم يُجرَ أي فحص في ما يتعلق بأي جانب تشغيلي بخلاف تلك الجوانب المدرجة صراحة في هذه الوثيقة. تم توفير صور مختارة لبعض مكونات الهيكل السفلي الفردية، وقد لا تعكس هذه الصور حالة الهيكل السفلي بأكمله.
الأبعاد
القياسات مُقدمة بشكل تقريبي فقط. قد تختلف الأبعاد الفعلية للحمولة بناءً على ارتفاع الشاحنة/المقطورة وتكوين/وضع الآلة المُحمَّلة. تقع على عاتق المشتري مسؤولية قياس جميع الأحمال قبل مغادرة موقع المزاد الخاص بنا لضمان أن الحمولة آمنة للنقل. يجب أن يتحقق المشتري من جميع القياسات. لا تعتمد على هذه القياسات لأغراض النقل.



